Skip to content
Competitive Pricing
5-100 Tonne Projects
50 Years Experience
Fully Insured

Mezzanine Floor Solutions

At Steelgram Fabrications, we help Sheffield businesses unlock hidden space with fully compliant, fire-rated mezzanine floors – designed to grow with you and installed with minimal disruption.

Whether you’re managing a warehouse, production line, or retail unit, our turnkey solutions are tailored to your operations, comply with all UK regulations, and eliminate the need for costly relocation.

With over a decade of trusted local experience, we handle everything (from initial design to installation) so you can focus on running your business.

Contact us today for a quote.

steelgram fabrications accreditations
storage pallets on mezzanine floor
We’re based in Sheffield, but serve the entire UK.

MEZZANINE QUOTE

Every project is designed from scratch to your specific needs, so click the button below to fill out our quick quote form now:

Click to Get a Quote

retail mezzanine
office on mezzanine floor in warehouse
mezzanine floor gate
ecommerce company mezzanine floor system
two storey retail office unit
orange and black metal staircase to mezzanine
storage pallets on mezzanine floor
two storey mezzanine office in warehouse unit
industrial mezzanine staircase inside working factory
black metal staircase to mezzanine level in factory
large warehouse mezzanine storage level
tall mezzanine warehouse
modern mezzanine office warehouse
modern mezzanine storage showroom
multi story mezzanone floor in warehouse with pallets
mezzanine warehouse with pallets
stairs to high mezzanine floor
large mezzanine warehouse showroom
mezzanine floor with access staircase inside building
mezzanine floor decking
steel mezzanine floor system installation

TRUSTED BY

client logos

For a free no obligation quote, call our specialist team today

Call us now on 0114 272 5996

Why Choose Steelgram’s Mezzanine Service?

  • Sheffield-based team – rapid site visits, local compliance expertise, and in-depth understanding of regional industrial estates and regulations.
  • Maximise your existing space – bespoke mezzanine floors designed to double your usable area without costly relocation or downtime.
  • Full turnkey service – from initial survey and CAD design to manufacturing, installation, and building regulation sign-off.
  • Minimal disruption guaranteed – we plan around your schedule to keep your operations running smoothly throughout.
  • Proven results across warehousing, manufacturing & retail – delivering scalable solutions tailored to Sheffield’s commercial sectors.
  • Fire-rated and load-certified options – ensuring full legal compliance with UK building and safety standards.
  • Built to grow with you – modular designs that adapt as your business evolves.
  • Trusted local fabrication – precision-engineered steelwork crafted right here in South Yorkshire.
  • No hidden costs – just straightforward, cost-effective space optimisation with unbeatable ROI.

You’re out of space. Again.

Not metaphorically – physically.

That forklift’s wedged tighter than a Greggs queue at lunchtime. Your warehouse team is stacking pallets like it’s a game of industrial Jenga. You’ve walked the site twice, maybe three times this morning, pacing around like a project manager with no project.

You know you need more space. But the lease is fixed. And moving? That’s a budget-blowing headache nobody wants.

So you’re here. Not wondering if, but which mezzanine. And that, mate, is exactly the right question. Let’s pull this apart like an engineer with a torque wrench.

Which Mezzanine Floor Type Will Actually Solve Your Space Problem?

office on mezzanine floor in warehouse

You already know you need a mezzanine. What you’re unsure of is which kind is going to give you exactly what your space and operations demand. Choosing wrong could mean wasted headroom, inefficient material flow, or even compliance risk.

Let’s go deeper – because the differences go way beyond the label.

  • Storage Mezzanine: Think of this as the steel backbone of any industrial space – built to bear the weight of your operation, not just your product. Typical ratings? 3.5–9.6 kN/m² (350–960 kg/m²). If your warehouse resembles one of Amazon’s Rotherham hubs on Black Friday, don’t even consider underbuilding. And here’s a visual for you: those lightweight decks with a nice OSB finish? About as helpful for IBC storage as a soggy Rich Tea. Stick to Treadplate for grip, and check your point load calculations – because you’ll feel it when it fails.
  • Office Mezzanine: Trying to fit an office into your warehouse is like adding a quiet reading corner to The Leadmill on student night. Doable? Yes. But only with the right insulation, layout, and noise-dampening spec. Thermal-rated partitions, suspended MF ceilings with acoustic panels, and resilient floor channels make all the difference. Loads? 2.5–4.0 kN/m². Don’t skimp – your team’s ears (and sanity) will thank you.
  • Retail Mezzanine: Here we’re talking customer experience. Think Meadowhall but in microcosm. You’re creating feel, not just floor. Glass balustrades, fire-rated vinyl flooring, tactile edging, and above all, a sense of space and safety. You’ll need 3.0–5.0 kN/m² depending on display weight. It’s not just about what it holds – it’s how it makes people feel when they browse. Think John Lewis, not car boot sale.

Match mezzanine type to the rhythm of your operation, not just the physical footprint.

Learn more about mezzanine floors here.

So you’ve picked your category. Now it’s time to weigh up the real bones of the thing – fire rating, load rating, flexibility. Only one of them has no second chance.

Fire Rating, Load Capacity or Flexibility – Which Should Come First?

 

large mezzanine warehouse showroom

Ah, the battle of priorities. Do you go full-on Fort Knox with fire protection? Max-out the load rating? Leave wiggle room for future growth?
Spoiler: the answer isn’t either/or – it’s sequence. Let’s break it down.

Load Capacity

Would you let someone build your house without knowing what furniture’s going in? Same principle here. A 4.8 kN/m² floor might sound tough until you drop three tonnes of boxed cable reels on it. For live load zones – like pick stations or light assembly – you want 7.2 kN/m² minimum, with a deflection of L/360 or better. That’s engineer speak for “won’t bounce like a trampoline under a man with a pump truck.”

Fire Protection

If your mezzanine crosses 50% of the building footprint, stretches past 20m, or holds people more than products, your fire game needs to be strong. That means 60-minute resistance from Siniat GTEC Fire Core casings, and dual 12.5mm board ceilings with insulated MF frames. Don’t forget emergency lighting and 2-point egress with proper panic gear. Imagine trying to evacuate your staff while they’re dodging pallets on a single flight staircase. It’s not just non-compliant – it’s inhumane.

Flexibility

Business needs change faster than parking rules on West Street. If you’re likely to reconfigure, ask for a bolt-together modular frame with M20 bolting systems. It allows you to add bays, reroute load paths, or even lift out a beam to install an HVAC trunk. If you’ve ever played Meccano, it’s like that – on steroids.

Key takeaway: Get your structure to match your workload first. Don’t start talking options until the basics are nailed.

Learn more about the flooring construction here.

You’re structurally sound. But how do you keep your layout from turning into a spaghetti mess of blocked forklifts and bottlenecks?

Does Your Existing Layout Work With or Against Mezzanine Design?

mezzanine floor with access staircase inside building

Your floor is more than just a rectangle. It’s a living, breathing organism. With bottlenecks. Choke points. That dodgy damp patch no one’s talked about in years.

And if your mezzanine ignores that reality, it’s just an expensive shelf in the wrong place.

Column Positioning

Standard bay spacing sits at 3.6m–4.8m. But if you’ve got overhead cranes, awkward HVAC, or tight MHE paths, you’ll need long-span beams (think UB 203x133x30 or bigger). It’s not cheap, but neither is smashing a column with your Combilift. Remember: productivity lost dodging steel posts is never gained back.

Picture the freight company that had to redo an entire aisle when their mezzanine designer ignored aisle turning radii. The fix? Cantilevered edge beams and 2 tonnes of regret.

Staircase Access

This one’s trickier than it looks. You need one for every 20m of travel, yes. But do you want it next to your dispatch zone where pickers bottleneck? Or tucked into the least accessible part of the building? Consider a dog-leg design (1800mm landings) to save linear space.

Ceiling Height

Got under 4.5m to play with? Things get tight – real tight. A deck and beam alone will eat up 350mm–450mm. Your head clearance needs 2.1m both above and below. That leaves around 400mm of breathing space, unless you move to 127x76x13 slimline profiles or metal web joists.

Think of layout like choreography. You want to flow, not fumble.

Layout locked? Now come the extras. Some will make your life easier. Others are… well, just shinier ways to waste your budget.

Which Add-Ons Will Actually Save You Time Every Week?

This is where the upsells begin. But not all extras are gold-plated nonsense. Some are game-changers. Others are what your mate Dave calls “fancy but functionless.” Let’s sort the gold from the glitter.

Pallet Gates

If you’re not using them, you’re either mad or invincible. A 1400–1600mm wide up-and-over gate, rated to 1000kg, lets your forklift operator do their job without putting someone in A&E. Install 1 metre from the edge so there’s standing room – and avoid swing gates in tight corners unless your staff are ballet dancers.

Example: Wholesaler staff could be losing 4 hours a week by manually shunting pallets into position. They install mirror-mounted gates on either end of the deck to address the issue. Efficiency jumps. Injuries? Drop to zero.

Integrated Lighting

This one pays for itself. Under-deck lighting with 300–500 lux and CRI 80+ rating means your pickers aren’t squinting at labels or mistaking white for cream. Add PIR sensors, and your electricity bill stops acting like a Christmas light display.

Lift Shafts

Platform lifts (to 500kg) work fine if you’re shifting the odd box. For serious weight or volume, go with a freight hoist (rated to EN 1570-1). Upfront cost is higher – but so is the cost of repetitive strain injury claims.

Safety Handrails & Edge Markings

Standard railings work. Powder-coated versions work longer. Add anti-scuff corner pads and reflective Class R2 decals and you’ve got both safety and aesthetics. And let’s be honest – your insurer does care how that report looks.

If it saves time, protects staff, or reduces mistakes – it’s not an add-on. It’s essential.

Will a Standard Kit Mezzanine Do – Or Do You Need a Fully Bespoke Solution?

You’ve seen the ads. “Off-the-shelf mezzanine, installed in a week!” Sounds perfect – unless your warehouse is shaped like a pizza slice.

Pre-Engineered Kits

  • Standard bay widths: 3.6m or 4.8m
  • Load: 3.5–5.0 kN/m²
  • Deck: 18–30mm chipboard or OSB
    Great for rectangle units with clean slab and no obstacles. But add a drain cover, column, or odd corner – and it’s like trying to carpet-fit in the Millennium Gallery with a butter knife.

Tip: Ask if the feet come with adjustable jacks (±25mm) – uneven slabs can throw a 30m run out by inches.

Bespoke Systems

  • Multiple heights? Sorted.
  • Weird corners or obstructions? Designed in.
  • Want 75mm pre-drilled cable trays or 200mm HVAC voids? No problem.

Final takeaway: Kits are great – if your building behaves. Otherwise, design for what you’ll become, not just what you are.

 

steelgram fabrication logo

From Concept to Completion – Seamless, Expert-Led Delivery

From first conversation to final installation, Steelgram delivers a seamless, stress-free structural steelwork service you can trust – precision-built at every stage.

1. Initial Consultation & Site Visit

We begin by visiting your site to carry out a thorough inspection and discuss your exact requirements.

This face-to-face stage allows us to understand your goals, assess site conditions, and identify any early challenges. It also gives us the opportunity to advise on the most efficient, cost-effective structural solutions.

  • On-site consultation
  • Tailored project advice
  • Early identification of risks or opportunities
engineer visiting site
2. Bespoke Design & Engineering

Our experienced in-house design team creates a fully bespoke solution, tailored to your project’s structural, functional, and aesthetic needs.

Working with advanced design software (like AutoCAD and Tekla Structures), we ensure all specifications meet the necessary compliance standards while maximising performance and cost-efficiency.

  • Fully engineered structural designs
  • UKCA-compliant drawings
  • Collaborative design process with architects, engineers, and contractors
complex steel design
3. In-House Fabrication

Once the design is approved, we move into fabrication at our Sheffield facility. Every steel component is manufactured to the highest standards using quality-assured materials and processes.

Our fabrication team is highly skilled, working to precise tolerances to ensure a perfect fit on site.

  • Manufactured in-house for total quality control
  • CE/UKCA certified steel components
  • Fast, efficient production timelines
man welding steel during fabrication
4. Delivery & Installation

When the steel is ready, we transport all components to your site and carry out a professional installation.

Our site teams are fully trained, insured, and committed to delivering safely, on time, and in line with your project schedule. Whether working on a complex retail refurbishment or a new build, we’re flexible and responsive to the realities of your site.

  • Nationwide delivery and site installation
  • Health & safety compliant (CHAS, Acclaim, SSIP)
  • Reliable, deadline-driven completion
crane installing structural steel
Not Sure Where to Start? Let’s Talk Steel.

Invite us for a no-obligation site visit and get tailored advice from the experts.

Call us now on 0114 272 5996

Fully Accredited & Insured

UKCA accredited
UKCA Accredited

We are fully certified with the UKCA marking, ensuring all our fabricated steel components meet the strict safety and performance requirements for use in the UK. This certification gives you peace of mind that your project meets current legal standards.

Construction Gold
Constructionline Gold Member

As a verified Gold Member of Constructionline, we’ve been independently assessed across multiple critical areas – including quality assurance, environmental management, equality policies, and anti-bribery measures. This means we meet stringent criteria that go well beyond standard industry requirements.

CHAS Premium Plus
CHAS Premium Plus

Our CHAS Premium Plus accreditation confirms we operate to exceptional standards in health and safety, environmental management, financial stability, and risk mitigation. You can trust that every part of your project will be delivered safely and responsibly.

Acclaim Accreditation
Acclaim Accreditation

We are Acclaim Accredited, a mark of excellence aligned with SSIP (Safety Schemes in Procurement). This certifies our robust approach to health and safety management – crucial for complex steelwork installations in live environments.

Fully Insured for Your Protection

We carry extensive insurance to ensure you are fully protected throughout the project:

Public Liability – £10 million | Employers Liability – £10 million | Professional Indemnity – £2 million

Our Past Clients Include

tgi fridays
tnt
Sheffield Children's Hospital
Wren Kitchens

Why Choose Us?

5 - 100 Tonne Projects

We handle projects from 5 tonnes up to 100 tonnes.

Fast Estimating Service

We offer a fast estimating service to help you make an informed decision in real time.

Nationwide Capabilities

We regularly complete projects across the entire UK.

Competitive Pricing

We offer competitive prices that are value-engineered where opportunities allow.

Accurate Timings

We pride ourselves in starting and finishing schemes on time.

Adaptable Fulfillment

Flexible to suit our client’s ever-changing needs, working to achieve previously agreed deadlines despite late changes from the professional parties – particularly important in retail refurbishments where contract periods are short.

50 Years Experience

Our directors have 50 years combined experience in steel fabrication and construction projects.

Fully Insured

We hold public liability insurance up to £10 million, employer’s liability insurance up to £10 million, and professional indemnity insurance up to £2 million.

For a free no-obligation quote, call our specialist team today, or click the button to get a quote online.

Call us now on 0114 272 5996

Location & Service Area

Located in Sheffield, we service the entire UK, from initial site visit and design, all the way through to installation.

Our competitive pricing allows us to compete well with local firms, so contact us for a quote today.

Steelgram Fabrications

1 Parkway Avenue, Sheffield, S9 4WA

0114 272 5996

sales@steelgram.co.uk

steelgram fabrication logo
large canopy warehouse
mezzanine floor gate
custom retail staircase

Steelgram Fabrications, providing structural steelwork services from the design stage through to completion.

Address

1 Parkway Ave, Sheffield S9 4WA

Back To Top